Guessing how much timber you need to buy can lead to buying too much and a second trip to collect remaining items, or worse, having to make extra trips to collect offcuts of timber. It’s better to spend a little time calculating your requirements first and save money in the long run.
Start With A Proper Cut List
It is much easier to ring up the timber required for a job if you have previously drawn up a sketch of the completed article. A list of all the individual items required for the project should then be drawn up, including the length, width and thickness of each item required. For example, a fence panel job would require 8 posts of 2.4m, 12 rails of 1.8m and various numbers of, for example, feather boards, and gravel boards. It is much easier to add all of these up individually than to try to estimate the total amount of timber required.
Know Your Standard Stock Lengths
Timber is stocked in fixed lengths, generally 2.4m, 3.0m, 3.6m & 4.8m, so buying against these will be far cheaper than cutting up longer lengths to make up the same amount of timber. For example, six pieces of 1.2m timber can be bought as two 2.4m lengths with no waste, but six lengths of 1.3m timber will result in large off-cuts, with each length only being of any use as one single item. Where possible, alter the dimensions of items on your cut list to fit within the stock lengths available.
Add A Sensible Waste Allowance
Allow a little extra for waste. For straight forward jobs like fences and shed sides allow 10% for waste (so if the job is to be 100m long allow 110m). Jobs involving mitres, angled cuts etc or for complete novices allow 15-20% for waste. This allows for errors as well as timber of poor quality.
Understand Nominal Versus Actual Sizes
Remember that the nominal size of timber e.g. 100mm x 50mm will be the size prior to it being planed. Sawn timber is supplied at nominal sizes whereas planed and parallel aromatic (PAR) timber is supplied at the actual finished size. So for example 100mm x 50mm timber could actually be 95mm x 45mm after planing. This must be taken into account when designing the frames of stud walls, decking joists etc. and when allowing for clearance between objects. Always check the actual size with the supplier before cutting to fixed sizes. See also Timber Merchants Southampton.
Account For Laps, Overlaps And Joints
For decking, fence panels etc the joins (e.g. laps between panels) will use up some length. This is easy to forget when totaling up the required length. For a lapped fence rail for example you will require extra length at the post to allow for overlap. For butted decking boards on joists you will require length at each side of the joint for bearing. Add 50-100mm per join to your total for these types of project and multiply by the number of joints in the design.
Check Moisture Content Before You Buy

When choosing timber, it will shrink as it dries out. There is a great deal of variation depending on whether you have purchased green (unseasoned) timber or kiln-dried timber. As a rough guide, green timber can shrink as much as 20% and will also twist as it dries out. This can cause large problems with load bearing structures or areas where there is to be a tight fit. As a rule, it is always better to pay a little extra and opt for kiln-dried timber for components such as stud work, skirting etc. that are to be seen after completion. Ask your supplier for the moisture content of the timber that you are purchasing.
Convert Area Jobs Into Linear Metres Properly
For area-based orders (such as flooring or cladding) the area is often provided in square meters and assumed that this is the total amount of timber required. However, this must be converted into the actual linear meters of board required (taking into account the width of the board plus the required overlap). For example, a shiplap board covers 150mm per run (150/1000 = 0.15m per run). So for example, a board 200mm wide would be required in the following linear meters: 10m x 2 (for return corner) x 0.15m = 3m. In addition to this, there will be further waste in any stochastic pattern (such as diagonal) due to the cutting errors at the ends of runs. Guidance on where waste occurs on building projects is provided in WRAP’s useful, plain-English guidance on reducing construction material waste.
Ask For Help With The Final Numbers
It’s also a good idea to run your finished sketch, cut list and planned waste allowance past the staff at your local timber merchants in Southampton for any obvious errors prior to you ordering. It doesn’t cost anything to ask for advice!
The cut list for your project is the starting point for ordering, cutting and assembling your project so get it right!